KEEP UP WITH OUR DAILY AND WEEKLY NEWSLETTERS
happening now! ISE 2026 showcases how high-performance sound and smart technologies transform residential spaces into stress-reducing environments.
the spiral structure is built from upcycled lantana camara, an invasive shrub introduced to india through colonial trade routes.
connections: +990
designboom discusses this creative boom with stefano boeri, MVRDV's winy maas, christian kerez, beat huesler of oppenheim architecture, and the team at bofill taller de arquitectura.
the proposal draws from a historic english architectural feature composed of alternating curves.
the zando central market redevelopment turns one of the congolese capital’s most vital spaces into an infrastructure for 20,000 vendors.
connections: +1830



detail image © brian benson
detail image © brian benson



interior image © brian benson
interior image © brian benson
buildup of ‘jellyfish theatre’
buildup of ‘jellyfish theatre’
buildup of ‘jellyfish theatre’
waterbottle wall constructed around the lounge area
buildup of ‘jellyfish theatre’
buildup of ‘jellyfish theatre’ image © maja mysliborska
interior during buildup process
floor being laid
buildup of ‘jellyfish theatre’
buildup of ‘jellyfish theatre’
rendering
cross section
priliminary plan