KEEP UP WITH OUR DAILY AND WEEKLY NEWSLETTERS
amid the rush of a hyper-accelerated world, the hue stands in for a blank canvas.
connections: 45
designboom radar rounds up a list of must-see exhibitions around the world to check out during the month of december.
connections: +160
running until july 26th, 2026, the show marks the first time wes anderson’s archives have been publicly displayed in the UK.
connections: +190
the spiral structure follows principles of fluid dynamics and thermodynamics to optimize heat distribution.
connections: 94


detail of one of the roofs
raw materials cleaned and ready to go
a roof construction made from a metal frame with wire used to keep the plastic bottle components intact
assembling one of the shades
a colorful green and yellow roof
wood and metal scraps were used to build the structural frames
aluminum cans were cut and woven creating textural coverings
production in progress
installation in progress

colorful raw material
cutting and assembling plastic containers
more raw material…
found metal and wood parts used as structural components
designer heath nash with some of the artisans