KEEP UP WITH OUR DAILY AND WEEKLY NEWSLETTERS
amid the rush of a hyper-accelerated world, the hue stands in for a blank canvas.
connections: 45
designboom radar rounds up a list of must-see exhibitions around the world to check out during the month of december.
connections: +160
running until july 26th, 2026, the show marks the first time wes anderson’s archives have been publicly displayed in the UK.
connections: +190
the spiral structure follows principles of fluid dynamics and thermodynamics to optimize heat distribution.
connections: 94

stone spray robot
robotic arm that deposits sand
sand wall 500 mm x 150 mm x 400 mm
sand stool (formwork) beach sand, soil solidifier 200 x 200 x 200 mm
sand stool (no formwork) 400 x 400 x 400 mm
sand tree 200 x 200 x 400 mm
multi-directional arc experimentation resulting in a 200 x 200 x 100 mm object consisting of 23 arcs
mock-up produced without any scaffolding or support material which measures 170 x 170 x 400 mm, where as the structure began to grow, it shaped holes to allow the material to solidify faster
scale comparison: the column on the left took 20 minutes to create, while the one to the left took 10 – produced without any scaffolding or support material