monovolume architecture: hydroelectric power plant punibach

monovolume architecture: hydroelectric power plant punibach

<p>a hydroelectric power plant seamlessly integrates itself within the natural alpine ecosystem to convert renewable natural resources into useful energy.</p>


‘hydroelectric power plant punibach’ by monovolume architecture, planeiler alm, italy
all images courtesy of monovolume architecture

 

 

hidden within the delicate landscape, italian practice monovolume architecture‘s ‘hydroelectric power plant punibach’
engineered by SEL AG, converts natural forces into useful energy while maintaining an artfully low profile in the alpine environment.
a rather simple solution was found for a space full of loud, bulky machinery while visually making an inconsequential impact of the site.
a free-flowing concrete structure peels out of the hills, opening a fissure in the hillside supporting a green roof that camouflages the
otherwise industrial building. thin wood planks of varying sizes are revealed in this split in the ground plane to form a lamellar wall,
where the warm light from the interior glows in the pitch-dark surroundings.

 

 

monovolume architecture: hydroelectric power plant punibach - 1
view form alpine forest

 

 

monovolume architecture: hydroelectric power plant punibach - 2

 

 

monovolume architecture: hydroelectric power plant punibach - 3

 

 

monovolume architecture: hydroelectric power plant punibach - 4
entrance

 

 

monovolume architecture: hydroelectric power plant punibach - 5
wood facade connection to roof plane

 

 

monovolume architecture: hydroelectric power plant punibach - 6
curvilinear roof form

 

 

monovolume architecture: hydroelectric power plant punibach - 7
slits in the wood plank wall emits a warm glow

 

 

monovolume architecture: hydroelectric power plant punibach - 8
view towards the access road

 

 

monovolume architecture: hydroelectric power plant punibach - 9
free-flowing concrete form

 

 

monovolume architecture: hydroelectric power plant punibach - 10
door detail

 

 

monovolume architecture: hydroelectric power plant punibach - 11

 

 

monovolume architecture: hydroelectric power plant punibach - 12
interior machinery

 

 

monovolume architecture: hydroelectric power plant punibach - 13
large light-filled interior

 

 

monovolume architecture: hydroelectric power plant punibach - 14
floor plan / level 0

 

 

monovolume architecture: hydroelectric power plant punibach - 15
section

 

 

monovolume architecture: hydroelectric power plant punibach - 16
section

 

 

project info:

 

 

client: puni energie gmbh (ltd.)
location: planeiler alm (bz) – south tyrol – italy
programme: hydroelectric power station
realisation: 2010/11
pressure pipeline length: 4.115 m
turbines: 2 horizontal pelton
average annual production: 14,3 mil. kwh
construction cost: 9,0 mil. euros