east architecture studio gives new life to niemeyer guest house in tripoli, lebanon

east architecture studio gives new life to niemeyer guest house in tripoli, lebanon

award-winning renovation of niemeyer guest house in tripoli 

 

Located in Tripoli, Lebanon, this renovated guest house stands just inside an entrance to the Rachid Karami International Fair, designed by Oscar Niemeyer between 1964 and 1975. Although incomplete and derelict since the Lebanese civil war halted construction, the 10-hectare site is one of the Middle East’s finest examples of Modernist architecture. After previous grandiose schemes envisioning its revival fell flat, the recent rehabilitation of one of its structures carried out by local practice East Architecture Studio offers a model of how a building-by-building approach could bring the fair back to life.

 

The renovation came about when a branch of the French Development Agency was seeking a home for Minjara, an initiative that aims to reinvigorate Tripoli’s famed but latterly declining wood industry. To do so, it provides a platform where its carpenters can meet up, share and learn skills, access state-of-the-art tools and a materials library, and meet designers from Beirut.

east architecture studio gives new life to niemeyer guest house in tripoli, lebanonentrance walkway | image © East Architecture Studio

 

 

More importantly, the project received the 2022 Aga Khan Award for Architecture, along with five other international works. ‘The renovation of the Niemeyer Guest House is an inspiring tale of architecture’s capacity for repair at a time of dizzying, entangled crisis around the world, and in Lebanon in particular, as the country faces unprecedented political, socio-economic and environmental collapse. […] The project has been carried out with great precision, its high quality revealing the exhaustive research the architects undertook. A sensitive understanding of the fair’s specific architectural language is carefully deployed to revive this important architectural and urban heritage,’ writes the Aga Khan Award jury.

 

‘In this carefully crafted space, reverence for the ‘hand’ is perpetuated through the proposed program: an active wood workshop sustaining small-scale carpentry and reviving the city’s history of craft. The project regenerates much-needed micro-economies and advocates inclusiveness, inviting the surrounding community into its heart. It reveals how paramount it is today to consider architectural rehabilitation and socio-economic revival as an indivisible whole.’

east architecture studio gives new life to niemeyer guest house in tripoli, lebanonglass partition | image © East Architecture Studio

 

 

carrying out light and reversible interventions 

 

An introverted, windowless structure from the outside, the single-story Niemeyer Guest House is flooded with light within via a central atrium and two courtyards. Its structural system comprises load-bearing walls and a concrete diagrid of deep beams covering the atrium to create changing shade throughout the day.

 

Given the lack of archival material, the team at East Architecture Studio extensively studied Niemeyer’s completed work elsewhere to build up a sense of what he intended. Their interventions tread lightly and are almost entirely reversible, notably including operable glazed partitions, a durable grey paint finish on all but the floor surfaces, and a waterproof, lightweight concrete slab roof, the original roof being no longer watertight. In addition, an electrical system was integrated into a new concrete floor and passed, concealed, along the main columns into ceiling tracks.

 

 

 

 

The main ground-floor area now hosts a reception, materials library, exhibition and meeting spaces, administrative zone, toilets, carpentry workshop, assembly/think-tank space, machinery storage area, and service room for dust-extracting machinery that transforms wood dust into compact bricks. No new walls were added aside from the glass partitions, and all furniture is free-standing. The architects have thus preserved the building’s structural, material and spatial qualities while successfully meeting users’ needs.

 

It is our hope that this award can celebrate the collaborative work behind this project and become the first step towards exemplary, careful rehabilitation and adaptive reuse for the rest of the fair site,‘ concludes the jury. 

east architecture studio gives new life to niemeyer guest house in tripoli, lebanonlateral space | image © East Architecture Studio

east architecture studio gives new life to niemeyer guest house in tripoli, lebanon

central courtyard | image © Aga Khan Trust for Culture, Cemal Emden 

 

niemeyer-guest-house-tripoli-designboom-1800

entrance walkway | image © East Architecture Studio

east architecture studio gives new life to niemeyer guest house in tripoli, lebanonexhibition space | image © East Architecture Studio

east architecture studio gives new life to niemeyer guest house in tripoli, lebanonlateral courtyard | image © Aga Khan Trust for Culture, Cemal Emden 

 

niemeyer-guest-house-tripoli-designboom-full-1

think tank space | image © Aga Khan Trust for Culture, Cemal Emden

 

 

1/3
central courtyard | image © East Architecture Studio
central courtyard | image © East Architecture Studio
workshop space | image © East Architecture Studio
workshop space | image © East Architecture Studio
workshop space | image © East Architecture Studio
workshop space | image © East Architecture Studio

project info:

 

name: Renovation of Niemeyer Guest House 

location: Tripoli, Lebanon

rehabilitated area: 1,917 sqm 

site area: 3,200 sqm

commission date: February 2018 

design dates: February – April 2018 

construction dates: June – October 2018 

occupancy date: November 2018

 

client: Expertise France

client team: Julien Schmitt (former team leader), Frederic Anquetil (special wood manufacturing consultant)

project advisor and client partner: Association of Lebanese Industrialists / Danny Abboud

 

architecture: East Architecture Studio 

lead architects: Nicolas Fayad, Charles Kettaneh 

project architects: Lucile Abi Chebl, Elie Geha

junior architects: Lina Hammoud, Zeina Chamseddine 

 

project operation: René Moawad Foundation with Expertise France through European Union funding 

project manager: Joya Douaihy

platform manager: Nour Sawaya 

production manager: Valery Haykal 

sales manager: Diva Chbeir

designer: Joanna Ghosn

field quality coordinator: Ehab Rajbieh

equipment & operation manager: Ali Boksmati

equipment & operation manager’s assistant: Raafat Nachabe

 

site supervision: TECC Consulting / Ziad Yazbeck 

site construction: Ghazzaoui & Taleb Contracting / Mohammad Abdi, Alaa Housseiny, Moustafa Saad, Rayan Taleb, Aref Zaid | Topcat Industries / Dany Abboud 

KEEP UP WITH OUR DAILY AND WEEKLY NEWSLETTERS
suscribe on designboom
- see sample
- see sample
suscribe on designboom

ARCHITECTURE IN LEBANON (71)

OSCAR NIEMEYER (26)

RENOVATION ARCHITECTURE AND DESIGN (726)

PRODUCT LIBRARY

a diverse digital database that acts as a valuable guide in gaining insight and information about a product directly from the manufacturer, and serves as a rich reference point in developing a project or scheme.

designboom will always be there for you

milan, new york, beijing, tokyo,  since 1999
X
5