KEEP UP WITH OUR DAILY AND WEEKLY NEWSLETTERS
designboom discusses this creative boom with stefano boeri, MVRDV's winy maas, christian kerez, beat huesler of oppenheim architecture, and the team at bofill taller de arquitectura.
the proposal draws from a historic english architectural feature composed of alternating curves.
the zando central market redevelopment turns one of the congolese capital’s most vital spaces into an infrastructure for 20,000 vendors.
connections: +1820
watch a new film capturing a portrait of the studio through photographs, drawings, and present day life inside barcelona's former cement factory.

the main materials in the front of house and theater are largely untreated timber, steel and plywood photo by patrick bingham-hall image courtesy woha
photo by patrick bingham-hall image courtesy woha
photo by patrick bingham-hall image courtesy woha
photo by patrick bingham-hall image courtesy woha
photo by patrick bingham-hall image courtesy woha
photo by patrick bingham-hall image courtesy woha
genexis theater in end stage formation photo by patrick bingham-hall image courtesy woha
genexis theater in center stage formation photo by patrick bingham-hall image courtesy woha
stage photo by patrick bingham-hall image courtesy woha
double curved timber bead walls and entrances to the theater photo by patrick bingham-hall image courtesy woha
detail of the timber bead wall image © designboom
genexis theater in flat floor mode photo by patrick bingham-hall image courtesy woha
photo by patrick bingham-hall image courtesy woha