KEEP UP WITH OUR DAILY AND WEEKLY NEWSLETTERS
designboom discusses this creative boom with stefano boeri, MVRDV's winy maas, christian kerez, beat huesler of oppenheim architecture, and the team at bofill taller de arquitectura.
the proposal draws from a historic english architectural feature composed of alternating curves.
the zando central market redevelopment turns one of the congolese capital’s most vital spaces into an infrastructure for 20,000 vendors.
connections: +1820
watch a new film capturing a portrait of the studio through photographs, drawings, and present day life inside barcelona's former cement factory.

entrance
interior view of opera theatre
outdoor stage
night view
schematic diagrams
opened and closed stages
floor plan / level +3 m (1) performer & staff entry (2) reception (3) taxi – drop off/pick up (4) staff car parking (5) accessible car parking (6) loading dock (7) store (8) stage basement (9) store
floor plan / level +12 m (1) public entrance (2) ticket office (3) cloakroom (4) escalators to MCH & restaurant (5) foyer (6) bar (7) exhibition space (8) BOH shop (9) security (10) opera hall (11) orchestra pit (12) stage (13) operable back stage (14) wings (15) store
architects’ sketch