metro arquitetos associados: the new castro alves theatre
 
metro arquitetos associados: the new castro alves theatre metro arquitetos associados: the new castro alves theatre
dec 13, 2010

metro arquitetos associados: the new castro alves theatre

the new castro alves theatre by metro arquitetos associados all images courtesy metro arquitetos associados

brazilian metro arquitetos associados have developed a proposal for the new castro alves theatre. the main issue raised by this project was how to add new uses to an already complex program, and, at the same time, increase the articulation between its spaces. to resolve the issue, the architects worked on two fronts: reading the uses and practices in the current configuration, sedimented through time, and reconnect them to the potentials, often ignored, of the original project, in a job that involved interpretation, recomposition and restoration.

they opened the existing building to the public, revealing how it works on the inside, as an object for exposition. through internal passages and a large square at a strategic level, they connected and articulated the existing collective spaces with new programs, either public or restricted. the center of reference of spectacle engineering follows the same logic of exposing itself to the visitor and to the city in a vertical open building that is properly connected to the original theater rooms, transforming the actions themselves in a way of exhibiting. all the fluxes and circulations were sorted out with the objective of consolidating a clear division that allowed all the areas to run simultaneously without any access conflict, acoustic interference or insufficiency of support services.

finally, all the show and rehearsal rooms were technically sorted out. considering that the ultimate goal of the new TCA is to provide the enjoyment of high quality artistic experiences and the ideal conditions for artistic creation, all the show rooms and the support areas were designed and equipped using the most appropriate criteria and systems currently available, with dimensions and solutions that allow the necessary flexibility that would integrate perfectly to the site.

view from a distance

the lower ground level

the pedestrian bridge which leads to the theatre

theatre

the new theatre

floor plan

floor plan floor plan

elevation

project info: date of project: 2009 public competition martin corullon, anna ferrari,gustavo cedroni, paloma delgado, paula noia, ricardo canton, bruno kim, alfonso simelio total area: 279.870 sq ft (26.000 m²)

    have something to add? share your thoughts in our comments section below.
    all comments are reviewed for the purposes of moderation before publishing.

    comments policy
    LOG IN
    designboom's comment policy guidelines
    generally speaking, if we publish something, it's because we're genuinely interested in the subject. we hope you'll share this interest and if you know even more about it, please share! our goal in the discussion threads is to have good conversation and we prefer constructive opinions. we and our readers have fun with entertaining ones. designboom welcomes alerts about typos, incorrect names, and the like.
    the correction is at the discretion of the post editor and may not happen immediately.

    what if you disagree with what we or another commenter has to say?
    let's hear it! but please understand that offensive, inappropriate, or just plain annoying comments may be deleted or shortened.

    - please do not make racist, sexist, anti-semitic, homophobic or otherwise offensive comments.
    - please don't personally insult the writers or your fellow commenters.
    - please avoid using offensive words, replacing a few letters with asterisks is not a valid workaround.
    - please don't include your website or e-mail address in your comments for the purpose of self-promotion.
    - please respect jury verdicts and do not discuss offensively on the competition results
    (there is only one fist prize, and designboom usually asks renown professionals to help us to promote talent.
    in addition to the awarded designs, we do feel that almost all deserve our attention, that is why we publish
    the best 100-200 entries too.)

    a link is allowed in comments as long as they add value in the form of information, images, humor, etc. (links to the front page of your personal blog or website are not okay). unwelcome links (to commercial products or services of others, offensive material etc. ) will be redacted. and, ... yes, spam gets banned. no, we do not post fake comments.

    PRODUCT LIBRARY

    a diverse digital database that acts as a valuable guide in gaining insight and information about a product directly from the manufacturer, and serves as a rich reference point in developing a project or scheme.

    architecture news

    ×
    keep up with our daily and weekly stories
    501,545 subscribers
    - see sample
    - see sample