MOST RECENT

construction begins on OPEN architecture's cavernous chapel of sound construction begins on OPEN architecture's cavernous chapel of sound
feb 15, 2019

construction begins on OPEN architecture's cavernous chapel of sound

#architecture

currently under construction, the organic volume rests on the floor of the valley, its form influenced by the sedimentary rock formations of the surrounding »

currently under construction, the organic volume rests on the floor of the valley, its form influenced by the sedimentary rock formations of the surrounding mountains.

PRODUCT LIBRARY

a diverse digital database that acts as a valuable guide in gaining insight and information about a product directly from the manufacturer, and serves as a rich reference point in developing a project or scheme.

in catalonia, lópez rivera arquitectos presents two houses clad in cork in catalonia, lópez rivera arquitectos presents two houses clad in cork
feb 15, 2019

in catalonia, lópez rivera arquitectos presents two houses clad in cork

compact and vertical, the houses rise above the rugged terrain on which the architects intervene as little as possible, preserving the natural topography of the »

compact and vertical, the houses rise above the rugged terrain on which the architects intervene as little as possible, preserving the natural topography of the landscape.

#architecture

PRODUCT LIBRARY

a diverse digital database that acts as a valuable guide in gaining insight and information about a product directly from the manufacturer, and serves as a rich reference point in developing a project or scheme.